Lead Project Planner Scheduler
Job Summary
The Lead Project Planner and Scheduler develops and maintains integrated project schedules for a large portfolio of projects. This role acts as a bridge between engineering, procurement, and construction teams to ensure schedule accuracy and on-time delivery. Key responsibilities include mastering Primavera P6 scheduling, critical path analysis, and managing re-baselining efforts to mitigate project delays.
Responsibilities
- Develop and maintain L2/L3 integrated project schedules in Primavera P6.
- Perform critical path analysis and manage re-baselining efforts.
- Bridge coordination between engineering, procurement, and construction teams.
- Integrate supply chain lead times and concurrent engineering workflows.
- Facilitate stakeholder reporting and project progress monitoring.
Required Skills
- Primavera P6 expertise
- Project planning and scheduling
- Critical path analysis
- EPC or heavy industrial experience
- Stakeholder communication
Job Details
Roles and Responsibilities:
ITO - OTR Handover & Schedule Initiation
- ITO Handover: Attend ITO/OTR handover meetings to receive the L1/L2 bid schedule. Validate ITO assumptions, risk registers, and contractual milestone dates.
- Baseline Feasibility: Assess the feasibility of the ITO schedule against known engineering and supply chain constraints. Identify gaps between the "sold" schedule and the "executable" plan.
- Kick-off Support: Support CKOM (Contract Kick-Off Meetings) and ensure all open action items related to schedule execution are tracked and closed.
Baseline Development & Functional Alignment
- P0 Baseline Creation: Develop the Level 2 (L2) and Level 3 (L3) Integrated Project Schedules using Primavera P6, adhering to global planning standards (e.g., GPSPE SCH 008).
- Supply Chain Detailing: Work closely with Sourcing/Procurement to integrate Supplier Lead Times, manufacturing cycles, and logistics durations. Ensure PO required dates are accurately reflected and synchronized across multi-unit projects.
- Concurrent Engineering Logic: Partner with Engineering functional leads to model Concurrent Engineering workflows. Ensure design releases are sequenced to support procurement and construction handoffs without conflict.
- Commitment Meetings: Lead the Commitment Meeting with functional owners (ENG, Sourcing, PM) to resolve disconnects, align on cycles, and secure buy-in for the project baseline (P0).
Project Schedule Maintenance & Control
- Progress Monitoring: Update the project master schedule monthly based on inputs from task owners. Analyze progress curves, float consumption, and "Say/Do" ratios.
- Critical Path Analysis: Perform deep-dive critical path analysis to identify potential delays. Proactively recommend mitigation strategies to the Project Manager and functional leadership.
- Constraint Management: Manage scheduling constraints (ALAP/ASAP). Lead re-baselining efforts (e.g., migrating from 00 to P0) ensuring minimal disruption to reporting and preserving commitment dates in shadow fields.
- Multi-Unit Coordination: Ensure consistency across multi-unit projects. Manage PO required dates to prevent drift between units, utilizing master activities or controlled constraints where necessary.
- Risk & Opportunity: Maintain the risk register within the schedule. Run "What-If" scenarios to assess the impact of potential risks or opportunities on the critical path.
Reporting & Integration
- Tool Management: Ensure Primavera P6 remains the "Single Source of Truth." Manage integrations with adjacent tools (e.g., Unifier, Pulse, WIPT, Tableau) to ensure data accuracy.
- Stakeholder Reporting: Prepare and present schedule updates to internal leadership, functional teams, and external customers. Adapt communication style for non-planning experts.
- Claims Support: Support Extension of Time (EOT) and cost claims by performing delay analysis (forensic or retrospective) to substantiate delays or disruptions.
Continuous Improvement & Governance
- Lessons Learned: Facilitate project close-out reports, documenting lessons learned and feeding improvements back into the Scheduling COE (Center of Excellence).
- Process Harmonization: Identify disconnects between regional teams or functions and drive solutions to standardize global processes.
Required Qualifications
- Bachelor's degree in engineering, Construction Management, Supply Chain, Business, or related field (or equivalent experience).
- 5+ years of experience in Project Planning & Scheduling within a complex engineering or EPC environment using Primavera P6.
- Power Generation and Heavy Industrial Equipment experience is preferred.
Desired Characteristics
- Advanced certifications in Project Management (PMP) or Scheduling (PSP - AACE).
- Courage to challenge functional leaders when durations are unrealistic or commitments are at risk.
- Ability to translate complex schedule data into simple, actionable insights for senior leadership and customers.